Work continues along SW 12th Street between SW Washburn Ave. and SW Gage Blvd.

  • A utility contractor is placing a utility line underneath a concrete stormwater culvert that runs perpendicular underneath SW 12th St. and SW Cambridge Ave.

  • New water service lines are being placed from the main to the meter near SW 12th St. and SW Cambridge Ave.

  • Curb forms are being placed on 12th St., just east of the Boswell Ave. intersection. Once the curbs are in place, base lifts of asphalt will be placed.


 
 
 