Curb and Gutter, Roadway and Parking Construction

Writer's picture: 12th Street Project Team12th Street Project Team

Looking down SW 12th Street to the east (pictured above on the right) and west (pictured above on the left) of SW Wayne Ave., you can see the asphalt roadway and concrete parking installed from SW High Ave. to SW MacVicar Ave. West of SW High Ave. along SW 12th St., concrete curb and gutter has been installed with the asphalt roadway and concrete parking to follow soon.


Asphalt roadway and concrete parking is installed from SW MacVicar Ave. to SW Plass Ave. The concrete curb and gutter, but no roadway or parking, has been installed from SW Plass Ave. to SW Woodward Ave. The asphalt roadway and concrete parking has been installed from SW Woodward Ave. east to SW Boswell Ave.

99 views1 comment

Recent Posts

See All

1 comentário


puccwfr
puccwfr
03 de nov. de 2022

"Asphalt roadway and concrete parking is installed from SW MacVicar Ave. to SW Plass Ave." There is no concrete parking in this section confirmed by Jeff at Bartlett and West. You may want to make sure your information is accurate.

Curtir

© 2021 by the City of Topeka

bottom of page